AB. The International Marine Contractors Association. Guidance on. Failure Modes & Effects Analyses (FMEAs). IMCA M April AB. IMCA M, Guidelines for Failure Modes and Effects Analyses (FMEA). • IMCA M, FMEA Management. • IMO MSC Circular , Guidelines for Vessels with . IMCA M “Guidance on Failure Modes and Effects Analysis” o. IMCA M “ FMEA Management Guide”. 2 Unless expressly stated in this Guidance document.

Author: Menos Fenos
Country: Mayotte
Language: English (Spanish)
Genre: Photos
Published (Last): 20 April 2013
Pages: 79
PDF File Size: 9.12 Mb
ePub File Size: 8.82 Mb
ISBN: 178-3-46104-322-2
Downloads: 20202
Price: Free* [*Free Regsitration Required]
Uploader: Jugore

Redundant equipment is to be separated by bulkheads that are to be fire-insulated by A class division, and in addition are to be watertight if below the damage water line. On completion of the FMEA trials programme, any recommendations that arise from the results of the trials should be assessed to ensure that the correct action is taken and that the required verification is completed to allow close out in each case.

Duplicated cables and pipes for services essential for the correct functioning of the DP system are not to be routed through the same compartments. The equipment layout is observed to verify that the DP equipment is not vulnerable to failure through failures in other equipment in the same compartment.

The failure detection means, such as visual, alarm devices, or none, will be identified. There should be fields in the punchlist for the question or item number, the question, the response or answer, and whether the item has been closed out or not.

Thruster units are to be installed in separate machinery compartments, separated by a watertight A class division. An FBD models the interconnection and relationships among physical system parameters. A modification to the design will enable a cross connection between port and starboard fuel supply systems so that one service tank could be taken out of service if required. Larger system modifications may require further FMEA tests and results to complete the analysis and, together with any recommendations and follow-up, presented in a new revised Final Report.

  ISOLASI PIPERIN PDF

Consequence Class 0 operations, which are operations where loss of position keeping capability is not considered to endanger human life or cause damage;? IMCA promotes improvements in quality, health, safety, environmental and technical standards through the publication of information notes, codes of practice and by other appropriate means.

Any fuel problems such as a broken pipe, a valve malfunction, or water in the fuel could cause loss of all generating engines if redundancy is not imcq into the system. The boundaries of the system consist of the following: A failure which has negligible effect on system or subsystem level generally at component level and results in minor unscheduled repair.

To accomplish this goal, FMEA tests are carried out both dockside and as an integral part of sea trials. When progressing through this document, it should be remembered that the FMEA process imac is not sufficient to ensure a meaningful analysis.

In an ideal world, where time, money and resources are unlimited, this approach would leave no stone unturned.

Guidance on failure modes and effects analysis (FMEA)

It also provides new operators with that extra knowledge of how the system responds to failures, knowledge that may be crucial in an emergency. The fundamental purpose of an FMEA is to prove that the worst case failure in practice does not exceed that stated by the designers in the functional design specification. COX will be running demos for the public from January The air supply to the dampers in the UPS battery rooms port and starboard was on a single supply line.

This case study demonstrates the importance of the FMEA. The cabling for the control systems is to be arranged such that under single fault conditions, including loss of a compartment due to fire or flood, it will remain possible to control ,166 thrusters to stay within the specified operating envelope.

Guidance on failure modes and effects analysis (FMEA) – IMCA

As the FMEA concentrates on analyzing hardware failures, the tests demonstrate and verify the response of control software that contributes to the correction of a hardware failure. It is easiest to track all drawings received, reviewed and revised using a database. Many types of failure mode have been revealed during an FMEA. The powering is then verified during audits. However, before DG4 was up to speed and synchronised, DG2 tripped on overload, leading to a blackout. The switch contact arrangement was revised so that a single contact short circuit would only shutdown one engineroom and not two.

  BAJIQUAN BOOKS PDF

The FMEA does not carry out the design itself but analyses a particular design, be it innovative or traditional design, for weaknesses with respect to failure modes.

It is both common sense and responsible design practice to carry out an FMEA on an item of equipment or a system whenever it is required to work in an environment where any failure mode has the potential for a catastrophic effect on the process. It is a design tool that has been around for a number of years and is used as a means of identifying single point failures or common mode failures in the design of any type of equipment, whether it is a simple widget or a complex system such as a DP system.

The generator protection and power management systems had no way of identifying the faulty machine although the PMS did generate load imbalance alarms prior to blackout.

A problem with the transfer switch would mean possible loss of control or complete loss of the essential equipment. In addition to the two independent automatic DP control systems, an independent backup control station is to be provided in a compartment separate from that for the main control station.

Note that for a Failure Modes and Criticality Analysis FMECAeach block can be assigned a failure rate figure from failure data and the overall system reliability calculated see Section 8.

This number is used to place priority on items that require additional quality planning.